Well, here is what 10 days can do to a bathroom remodel:
Glass block window complete and tiling of the shower / bath started.
Shower tile was installed ... with fun accent strip. Plumber called in to install proper pipes and rerouting of shower plumbing.
Then, 6.5ft tall wainscoting has been installed to go around entire rest of the bathroom. At this point it looks REALLY WHITE!
Parts of the walls that were to be repainted were Kilzed and then painted a lovely "outdoor cafe" color - it's a grayish/blue that I used in the baby's room as well.
At this point, the wainscoating needs to be finished, vanity lights and micro needs installed and trimmed. Trim needs to be added to top of wainscoat and floor tile trim needs to be finished, more grouting, caulking of the corners of the shower, and of course tile grout needs to be sealed on floor and shower. Oh, and of course, the new toilet and old sink need to be put back in...
For such a small space, it is a WHOLE LOTTA work!
1 comment:
It is looking fabulous! What a transformation. Makes me want to do the downstairs bath. :)
Post a Comment